缇东江
艾蓝Duhangan hydropower plant
Commercial operation of the 192 MW run-of-the-river hydropower plant, 艾蓝Duhangan, began in April 2010. The plant is located in the steep terrain of the Himalayas in the Kullu District of Himachal Pradesh.
-
2010Entered into operation
-
192 MWInstalled capacity
-
802妇女和Annual production
艾蓝Duhangan harnesses the potential of 850m head by diverting the water of Allain and Duhangan rivers. The water is transferred through two separate intakes, two water conveyance tunnels, a long pressure shaft of 1,587m and an underground power house. The plant also has a dedicated double circuit transmission line of 175 km.
The plant is operated as a peaking plant from November to May and as a base load plant during the summer and rainy season from June to October.
The company is certified in ISO 9001, ISO 14001 & ISO 45001. These certifications underline the company’s efforts within quality of generation, supply of dependable power to our customers, preventing pollution, ensuring a safe workplace and caring for the health of our employees.
In 2013, 艾蓝Duhangan was awarded the runners-up award for Best Hydro Power project by Power Line Awards. The award was presented by Mr Jyotiraditya M. Scindia, then Minister of State with independent charge for Power.
公司 | 所有权份额 |
mg游戏官方网站 | 49 % |
Bhilwara Energy Limited | 51% |